Ask the relocation team for the installed and moving load information separately. Mark actual feet, frame supports and wheel paths on the destination plan. A total machine mass alone does not describe how a slab, support or route is loaded.
Prepare the load schedule for the site engineer
| Condition | Evidence or load to obtain | Destination check |
|---|---|---|
| Installed equipment | Manufacturer’s operating mass, support points, load reactions if available and permitted variation. | Qualified review of support geometry and slab documentation. |
| Machine in service or actuation | Documented operation and any dynamic load information from the responsible supplier. | Engineer decides which actions require verification. |
| Movement and final position | Transport arrangement, wheel and temporary support positions and route. | Separate review of the relocation and handling method. |
Keep unknown loads open in the schedule
The engineer needs building drawings, floor changes and machine coordinates measured from the same datum. Record additional tanks, contents or equipment attachments that affect the declared load. Ask the supplier for support reactions rather than assuming a uniform split across feet.
Retain the written review before committing to a position. Document who supplies missing equipment data and who confirms the route and final layout.
Review the BottlingScout checklist for site readiness and relocation
Share the floor-loading data for the planned relocation with the machine drawing, proposed route and open structural questions.