Plan the line against the building’s existing activity. Draw the routes for materials, people, pallets and servicing on one layout. Add who uses each shared area and at what time. A path may work during normal production and become unavailable during goods receipt or another team’s work.
Check the shared interfaces before fixing the layout
| Shared area | What to record | Decision to agree |
|---|---|---|
| Goods receipt and materials staging | Direct routes, movement windows and temporary stock. | Who has priority when operations overlap. |
| Access for operators and maintenance | Required access and equipment service movements. | Which lane or area stays available during normal work. |
| Pallet dispatch and cleaning transitions | Output route, occupied times and restrictions. | When to release the area for each use. |
Test a working day with two operations running
Map representative peak periods and the order in which each user needs the shared area. Record current measurements and any capacity limits verified by the site. Have facilities, hygiene and safety teams review decisions relevant to their areas.
Request quotes against the agreed boundaries rather than a machine footprint alone. Record who approves a change to access, utilities or shared storage.
Review site readiness and utility planning for line installation
Share your shared-building bottling layout with traffic routes, access needs and time windows that overlap.