Prepare a bottling line move during the summer shutdown

Schedule a bottling line move into a summer shutdown by linking release, transport, installation and first production.

Italiano

Start from the first production date after the summer shutdown and work backwards. Give each stage a site owner and an explicit handoff. The dismantling team needs a release from the old site while the installer needs confirmed utilities and access at the new one.

Protect the sequence before fixing dates

Record what can happen before the shutdown and which tasks must wait. Keep supplier availability, transport clearance and the site acceptance window visible. Together with the project team, identify any contingency period before customer orders depend on the new line.

Use one row per handoff and attach the relevant evidence.
ActivityPrerequisiteIllustrative duration
Release and label equipmentLast production and signed scope1 day
Dismantle and loadLift plan and transport readiness2 days
Install and connectDestination ready and modules identified3 days
Trial and production releaseSamples, personnel and approved criteria2 days

If these example stages run in sequence, the sum is eight days. Add the travel time and any buffer separately, using confirmed dates.

Use the inspection and relocation checklist for the handover

Scope a shutdown move

Share shutdown dates, relocation route, line modules and first required production date.