Create a document register at receipt using the actual line and module identifiers. Keep the agreed acceptance criteria beside the signed evidence. Record which materials are available, which need updating after installation and who will close every missing item.
Keep delivery proof and commissioning evidence linked
Compare the packing list and delivered items first. Assign the date and signer to each commissioning or acceptance result. Relate open actions to one module and named owner. Keep information about final approval easy for the site team to retrieve.
| Document | Link to | Status |
|---|---|---|
| Delivery and included modules | Packing list and equipment IDs | ___ |
| Installed configuration | Updated layout and drawings | ___ |
| Witnessed run | Format, traceability and output record | ___ |
| Acceptance and open points | Signers, deadlines and closure | ___ |
Use the equipment handover and installation checklist
Review a line handover record
Send the packing list, test evidence and any module documents still open.